Enter the two station housing construction project of steel structure of Urumqi new railway station
Source:  Date:2015-06-03 14:44:59  Author:
 

Report from our correspondent (reporter correspondent Wang Changgang) up to now, by triumpher steel construction, the construction of the Urumqi railway station has been completed a phase, the second phase of the main steel structure 25956 tons, accounting for 92% of the main structure of the and a roof spherical grid structure 3491 tons, accounting for 66% of the spherical grid structure for roof and a view to the north station building of the spherical grid has been delivered to the construction of the roof board. The assembly work of two station building was in the grid.

New Urumqi railway station building and canopy and related engineering is in 2nd Lanxin railway engineering supporting an important project, but also increase the passenger capacity of the hub, passenger layout of important engineering integration. The project is located in Urumqi City Economic and Technological Development Zone is the two house train station, composed of master room and platform canopy. Urumqi new railway station building vertical is divided into 2 floors, 1 floors underground. More layers of high is 9.75 meters, layer 2 clear height of 25 meters, as stop, waiting hall and office and commercial space; underground 1 layer for outbound layer, the height of 10.8 meters. Station along the track to 258 meters width of the column is 22 meters, vertical rail to the width of the 301, rail vertical column 21 meters, 24 meters; stop hall and elevated waiting hall open space, modern and simple and direct. The station house cover is a large arched steel structure roof, and the maximum height of the roof is 41 meters.. The platform canopy symmetrically arranged on both sides of the station building. Station, with a total construction area of about 1 00000 square meters, no column platform canopy coverage area of 58224 square meters, station housing plane projection area 61553 square meters.

 

 

 
 
Copyright@2018Chao Feng Steel Group Co., Ltd.All rights reserved