YinChuan Railway Station
Source:  Date:2015-07-25 09:06:32  Author:
 



Name: YinChuan Railway Station 

Detail:Triumpher steel construction, the construction of the railway station steel structure including by station, platform canopy, stop bridge three parts, construction area were 29995 square meters, 99960 square meters (including a period: 38294 square meters, the second phase: 58366 square meters, 58.66 square meters, the total amount of steel of about 6000 tons.

 
 
Copyright@2018Chao Feng Steel Group Co., Ltd.All rights reserved